Things are moving along with the renovation on Saratoga Lake. New windows and doors have been installed throughout the home. Insulation is going in then drywall to follow. Below are some pictures a before of the living room & kitchen which will all completely be removed for an open concept space. The master bedroom has been widen and a walk-in closet created from the addition above the garage.